01-20-147 El Segundo Unified School District Summer Modernizations

Prequalifications:

First-tier Subcontractors: A contractor with a C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46 license(s) that intends to bid as a first-tier subcontractor to the prime contractor that is bidding directly to the District.

Scope of Work:

Includes modernizations to four separate campuses within the District.

  • Richmond Street Elementary School: Addition of a Security Vestibule, Replacement of Existing Windows at the main classroom/ Administration building. Installation of a 20’x 40’ shade structure (PC approved by Dave Bang) and concrete slab, Installation of ornamental fence and gates, Accessibility upgrade to restrooms. Material for shade structure will be provided.
  • El Segundo Middle School: Alteration of existing Administration Office, addition of 800sqft office space into existing covered breezeway.
  • Center Street Elementary School: Addition of two (2) shade structures (PC approved by Dave Bang) at two locations on campus. Site improvements; walkways and landscaping. Material for shade structures will be provided.
  • El Segundo High School: Security Vestibule in the Main Building, Replacement of Engineering Building windows, Replacement of baseball field fencing, Replace hoops, bleachers, refinish flooring in the South Gymnasium, Replace flooring in the North Gymnasium
Public/Private
Public