Project Description:

The Project involves an approximate 35,000 GSF building (“Instructional Building 1”) to be used primarily for classroom instruction and faculty offices as well as restrooms, staff break room and a mother’s room. The building will have a footprint of approximately 23,540 square feet and includes two stories. The ground floor will have a library that includes student meeting rooms and a large study area, 3,000 square foot meeting room, and restroom facilities. The second floor will have additional classrooms, conference room, staff lounge/break room and faculty offices. Outdoor amenities include pedestrian walkways and bicycle racks as well as installation of a signage wall, landscape, two bio-retention basins, security lighting, and infrastructure improvements

Prequalification Requirements:  Pre-Qualification is NOT required.

PLEASE NOTE: Addendum 3 recalls Addendum 2 (Addendum 2 has been removed).

Project Number
01-22-159
Location
Chino, CA
Public/Private
Public
DIR#
410776
Clamshell logo

AMG Proudly Uses Clamshell

Clamshell construction project accounting software simplifies project management for general contractors, subcontractors, and design professionals.

Scroll to Top